検索:set-transaction-status
adminが2022/04/24 04:58に最終更新
検索を絞り込む
カテゴリーを選択して結果を絞り込む
保存場所
- 10akaBot Center
- 2akaBot Agent
- 2akaBot Hub
- 1akaBot Vision
最終更新者
- 15admin
作成者
- 13admin
- 2Nhan Nguyen
作成日
- 1530日以前
オブジェクトの種類
アップロードした人
- 15admin
- 2Nhan Nguyen
アップロード日
- 10030日以前
[5] Queue (en)
保存場所
- 表示されるドキュメントの内容
selected in the Set Transaction Status activity in Studio. 12 Specific data JSON Schema data. b. Create
…Transaction Item or the Add Transaction Item activity; when an item has this status, your custom progress
…was processed with the Get Transaction Item or the Add Transaction Item activity; when an item has this status
- ドキュメントの内容のソース
to the error type selected in the **Set Transaction Status** activity in Studio. |12|Specific data|JSON Schema
…Transaction Item or the Add Transaction Item activity; when an item has this status, your custom progress
…" id="H1.CenterOverview" %) A **Queue** in simple terms is a container that holds a set of items
[1] Overview (en)
保存場所
- 表示されるドキュメントの内容
in akaBot Vision. When a staff uploads a document, the status of the imported document might
…the license is renewed, staff can retry to reprocess this document. TOREVIEW: when the Setting/automation type is not Always. The document is here to be reviewed by reviewer. CONFIRMED: when the Settings/automation type
- ドキュメントの内容のソース
: when the Setting/automation type is not Always. The document is here to be reviewed by reviewer. * CONFIRMED: when the Settings/automation type is Always, the document passes through ToReview status without
…in akaBot Vision. [[image:1696219721037-203.png]] \\When a staff uploads a document, the status
[3] How to use Desktop Trigger (en)
保存場所
- 表示されるドキュメントの内容
the trigger name String 255 Yes 2 Status Click to set the first status for trigger: enable/disable Toggle
…? 1 Trigger Name Fill the trigger name String 255 Yes 2 Status Click to set the first status
…Maximum Is Mandatory? 1 Trigger Name Fill the trigger name String 255 Yes 2 Status Click to set the first
- ドキュメントの内容のソース
="width:56px" %)Yes |2|Status|Click to set the first status for trigger: enable/disable|Toggle| |(% style
…|Trigger Name|Fill the trigger name|String|255|(% style="width:56px" %)Yes |2|Status|Click to set the first
…|Status|Click to set the first status for trigger: enable/disable|Toggle| |(% style="width:56px" %)Auto
[1] Agent (en)
保存場所
- 表示されるドキュメントの内容
allows you to add Agents, edit them, and examine their status as well as the change runtime settings and the Agent Group to which they are assigned. Note: When the status of an Agent is busy (executing a process
…machine Status The current status of the Agent. AVAILABLE - the Agent is connected to the Center
- ドキュメントの内容のソース
. The Agents page allows you to add Agents, edit them, and examine their status as well as the change runtime settings and the Agent Group to which they are assigned. **Note: **When the status of an Agent is busy
…. | |**Version**|The installed version of the akaBot Agent tool in the local machine | |**Status**|The current
[4] Set schedule (en)
保存場所
- 表示されるドキュメントの内容
Choose the process what you want to set schedule Combo box Yes Time Zone Choose time zone Dropdown list
…to re-trigger a schedule Textbox No Parameters No Holiday Settings Holiday schedule Radio buttons Yes There are 3 options: Run as set schedule (default) Bypass holiday settings Potponse until
- タイトル
[4] Set schedule
- 保存場所
[4] Set schedule
- ドキュメントの内容のソース
what you want to set schedule|Combo box|Yes| |Time Zone|Choose time zone|Dropdown list|Yes
…| | |No| |Holiday Settings|Holiday schedule|Radio buttons|Yes|((( There are 3 options: * Run as set schedule (default) * Bypass holiday settings * Potponse until the next run ))) == **2. Manage Schedule list
[3] Schedule (en)
保存場所
- 表示されるドキュメントの内容
by the Schedule. For more details, visit the Package Repository section. Status Status of the schedule. There are 3 common statuses: SCHEDULED – When the schedule is set up but not yet executed. DISABLED – When
…the Parameters and Holiday settings of said Schedule. - Parameters: From here, you can also see a list
- ドキュメントの内容のソース
by the Schedule. For more details, visit the Package Repository section. | |Status|Status of the schedule. There are 3 common statuses: SCHEDULED – When the schedule is set up but not yet executed. DISABLED – When
…information above, the **Details** page also shows the **Parameters **and** Holiday settings** of said
Center Installation Guide For High Availability Model on Redhat v9.x (en)
保存場所
- 表示されるドキュメントの内容
status Redis service sudo systemctl status redis 2.1.2. Step 2 – Configure Redis Remote Access 1
…– Configure Security Setting (optional) 1. Turn of Redis service (if running) sudo systemctl stop redis 2
…status sudo systemctl status activemq 2.2.4. Step 4 - Configure Java Heap Memory of ActiveMQ Service
- ドキュメントの内容のソース
. Verify status Redis service (% style="margin-left:40px" %) (% style="color:#c0392b" %)sudo systemctl status redis (% style="margin-left:40px" %) [[image:image-20230804101914-3.png]] === 2.1.2. Step 2
…Setting (optional) === (% style="margin-left:40px" %) ~1. Turn of Redis service (if running) (% style
Center Installation Guide for Standalone Model on Redhat v9.x (en)
保存場所
- 表示されるドキュメントの内容
-Xms: minimum Java heap size. Please set the number <= ¼ RAM capacity. Ex: If your akaBot Center machine’s RAM = 4G, then set -Xms1G. Parameter -Xmx: maximum Java heap size. Please set the number <= ½ RAM capacity. Ex: If your akaBot Center machine’s RAM = 4G, then set -Xms2G. 6
- ドキュメントの内容のソース
'// * **Parameter -Xms:** minimum Java heap size. Please set the number <= ¼ RAM capacity. Ex: If your akaBot Center machine’s RAM = 4G, then set -Xms1G. * **Parameter -Xmx:** maximum Java heap size. Please set the number <= ½ RAM capacity. Ex: If your akaBot Center machine’s RAM = 4G, then set
[1.2] Idea Life Cycle (en)
保存場所
- 表示されるドキュメントの内容
and Running Cost/Transaction After completing analyzing cost and benefits, the Project
…the idea's phase and status according to the project's progress. Team members will do their tasks and upload
…an idea to the "Live" phase with the status "In Production," it signifies that the idea is now available
- ドキュメントの内容のソース
and Running Cost/Transaction [[image:image-20230220162203-9.png||cursorshover="true
…to team members. Moreover, the Project Manager also changes the idea's phase and status according
…** === Once the project manager changes an idea to the "Live" phase with the status "In Production
[1] Center Installation guide for standalone model on Windows Server (Network Edition) (en)
保存場所
- 表示されるドキュメントの内容
set it to the default password ”sis@12345” to avoid having to update the Config file later. Click
…Tomcat Configuration 4.2.1. Configure log settings Step 1: Open the file %TOMCAT_PATH%\conf
…Step 5: Un-Comment the line of log setting to turn on the log and add attribute maxdays as below
- ドキュメントの内容のソース
.png"]] * When you at the **Accounts and Roles** page, it is recommended you set it to the default
…Configuration** === **4.2.1. Configure log setting**s Step 1: Open the file **%TOMCAT_PATH%\conf
…setting to turn on the log and add attribute maxdays as below: [[image:1714719488405-585.png||height="513