Search: switch

Last modified by admin on 2022/04/24 04:58

Results 1 - 10 of 30 next page » Page 1 2 3

[8] Setting up Auto Login for Unattended Agent

Last modified by admin on 2024/03/04 15:23
Rendered document content
Introduction This document is created based on the features of akaBot Platform v2.0.5.5 + and akaBot Center v2.0.4.0 +. If you are using the lower platform version, please switch to the relevant page
these steps: Step 1 - Switch to RDP mode Step 2 - Add parameter to Center > Agent > Agent Settings > Others
Raw document content
+. * If you are using the lower platform version, please switch to the relevant page to view the docs
because of legal disclaimer enabled** **Solution**: Please follow these steps: **Step 1** - Switch

[3] Review Document

Last modified by admin on 2024/01/11 18:13
Rendered document content
and confirms the document. When you open a document to review it, the status will switch to reviewing. During
will then change back to ToReview. Confirm the document by clicking on the Confirm button. This will switch
status and will be accessible in the Postponed tab. Delete the document. This will switch the document
Raw document content
to review it, the status will switch to reviewing. (%%)During this stage, user can make changes to the text
back to ToReview. * Confirm the document by clicking on the Confirm button. This will switch
a postponed status and will be accessible in the Postponed tab. * Delete the document. This will switch

[4] Production Vs. Test Environment Setup

Last modified by admin on 2024/01/10 15:49
Rendered document content
features in both PipelineGroups. Switching to production (paid) subscription If you choose to have
Raw document content
features in both PipelineGroups. == **Switching to production (paid) subscription** == If you choose

[1] About Data Service

Last modified by admin on 2023/12/21 22:15

Customize Dashboards

Last modified by admin on 2023/12/11 17:19
Rendered document content
Creating New View To create a new views, take the following steps: Step 1: Users click on Edit Dashboard in any view to access Tableau UI. At this point, the screen will be switched to the view configuration screen of the embedded Tableau platform. Note: The views in akaBot Insights are divided
Raw document content
-family:Arial,Helvetica,sans-serif" %)At this point, the screen will be switched to the view configuration

[1] Overview

Last modified by admin on 2023/10/03 12:07
Rendered document content
click Postpone button then that document will be moved to the Postponed tab (Switching to Postponed
will be moved to the Confirmed tab (Switching to Confirmed status). With a postponed document, reviewer can
such as CSV, XML, and JSON. When the file is exported, its status is switched to exported. Your volume license
Raw document content
to the Postponed tab (Switching to Postponed status). * Find that all the extracted data is ok, they can click Confirm button then this document will be moved to the Confirmed tab (Switching to Confirmed status
to export files such as CSV, XML, and JSON. When the file is exported, its status is switched to exported

[4] Triggers

Last modified by admin on 2023/10/02 16:38
Rendered document content
. Then click the switch located in the upper-left side of the window. 11. Automatically disabling a trigger
Raw document content
a trigger, you will first have to click on it to view its details. Then click the switch located

[2] How to create Human Task in a process

Last modified by admin on 2023/09/18 17:46
Rendered document content
conditional clause (If, Else, Switch) to complete the process. How to create a Human Task in a process
Raw document content
(If, Else, Switch) to complete the process. == **How to create a Human Task in a process

[9.1] How to save after designing a process

Last modified by admin on 2023/07/10 09:45
Rendered document content
conditional clause (If, Else, Switch) to complete the process. How to save after designing a process Note
Raw document content
(If, Else, Switch) to complete the process. == **How to save after designing a process

[9.1] Endpoint of a process

Last modified by admin on 2023/07/10 09:43
Rendered document content
conditional clause (If, Else, Switch) to complete the process. 9. Endpoint of a process To end a process
Raw document content
(If, Else, Switch) to complete the process. == (% style="color:inherit; font-family:inherit" %)**9
next page » Page 1 2 3
RSS feed for search on [switch]
Created by admin on 2022/04/17 14:38